• OmniMES logoOmniMES
  • Courses
  • Implementation
  • Blog
  • OmniMES News
  • About
  • Contact
All posts
  • OmniMES (39)
  • AI (22)
  • MES System (17)
  • UE (11)
  • Omnimes (9)
  • AGENT AI (8)
  • OmniEnergy (6)
  • industry50 (6)
  • Smart Factory (6)
  • MES (6)
  • Industry 5.0 (6)
  • EMS (5)
  • Sparkplug B (5)
  • MCP (4)
  • ISO 50001 (4)
  • MQTT (4)
  • robotics (4)
  • time-series data (4)
  • AI local (3)
  • cyberbezpieczenstwo (3)
  • DPP (3)

  • AI (3)
  • Redash (3)
  • XGBoost (3)
  • Data Security (3)
  • Digital Twin (3)
  • IIoT (3)
  • Industry 4.0 (3)
  • UNS (2)
  • energy efficiency (2)
  • it-ot (2)
  • NIS2 (2)
  • AI Act (2)
  • TimescaleDB (2)
  • nvidia (2)
  • Data Visualization (2)
  • mongoDb (2)
  • Production efficiency (2)
  • Lean Manufacturing (2)
  • IoT Communication (2)
  • energy consumption monitoring (2)
  • LLM Models (2)
  • HMI (2)
  • Data Analysis (2)
  • IoT (2)
  • TensorFlow (2)
  • LightGBM (2)
  • CatBoost (2)
  • industrial automation (2)
  • Communication Protocol (2)
  • CRA (1)
  • Relpol (1)
  • Physical AI (1)
  • Apache Iceberg (1)
  • CBAM (1)
  • PostgreSQL (1)
  • przemysł50 (1)
  • Production Data (1)
  • Technologie MES (1)
  • omniverse (1)
  • deepseek (1)
  • Data, (1)
  • digital factory (1)
  • IndustrialIoT (1)
  • IndustrialIT (1)
  • cybersecurity (1)
  • Production analysis (1)
  • renewable sources (1)
  • omnicloud (1)
  • saas (1)
  • on premise (1)
  • 7 Wastes of Muda (1)
  • docker (1)
  • Micro Services (1)
  • Maintenance (1)
  • Micro-downtime (1)
  • Bigquery AI (1)
  • Google Cloud (1)
  • Database Vector (1)
  • Quality (1)
  • ROI (1)
  • OmniMES (1)
  • 5G (1)
  • langchain (1)
  • faiss (1)
  • gpt (1)
  • documentation (1)
  • ai-assistant (1)
  • OEE (1)
  • Green Energy (1)
  • Web3 (1)
  • blockchain (1)
  • RES (1)
  • renewable energy sources (1)
  • energy tokenization (1)
  • smart contracts (1)
  • automated settlements (1)
  • P2P energy trading (1)
  • sustainable energy (1)
  • InfluxDB (1)
  • time-series data analysis (1)
  • PyTorch (1)
  • industrial data (1)
  • algorithm comparison (1)
  • industrial data collection (1)
  • machine data (1)
  • machine learning in industry (1)
  • algorithm performance (1)
  • XGBoost (1)
  • LightGBM (1)
  • CatBoost (1)
  • MES Systems (1)
  • Fault Detection (1)
  • llama3 (1)
  • Meta (1)
  • Gemma (1)
  • Mistral (1)
  • GPT-4 (1)
  • GPT-3.5 (1)
  • big data (1)
  • Reports (1)
  • GPT-4 API (1)
  • OPC UA (1)
  • Client/Server Architecture (1)
  • Data Standardization (1)
  • QoS (1)
  • Communication Standards (1)
  • Published on
    September 14, 2026

    Traceability in MES: building the product genealogy the Digital Product Passport demands — five months to 18 February 2027

    OmniMESUEDPPMES System
    From 18 February 2027 the product passport becomes mandatory for industrial batteries above 2 kWh, EV and LMT batteries. A passport cannot be assembled from a spreadsheet after the fact — it needs product genealogy captured by the MES while the goods are being made. Here is which data has to be linked, which standards now govern it (EN 18219, EN 18220), and what a mid-sized factory can realistically finish in five months.
  • Published on
    August 31, 2026

    Digital Product Passport for batteries: 5.5 months to 18 February 2027 — what your MES must cover (lessons from the Battery Pass, Volvo and GBA pilots)

    OmniMESUEDPP
    From 18 February 2027 every LMT battery, every industrial battery above 2 kWh and every EV battery placed on the EU market must have a battery passport (Article 77 of Regulation 2023/1542). Based on the European Commission guidance of August 2026 we explain which data points are mandatory from February, which are not yet filled in (carbon footprint, recycled content, due diligence), what the Battery Pass, Volvo and GBA pilots showed, and what data your MES should prepare.
  • Published on
    May 18, 2026

    Digital Product Passport (DPP) enters the factory: ESPR and Battery Regulation 2027 — what MES must deliver by February

    UEOmniMESDPPMES System
    On 18 February 2027 the battery passport becomes mandatory for EV batteries, industrial batteries above 2 kWh, and LMT batteries — the first concrete moment when the Digital Product Passport (DPP) turns from EU concept into a hard production requirement. For an MES, this means exposing roughly seventeen attributes per unit: material origin, carbon footprint, recycled content, batch ID, durability, cell health data. This article walks through ESPR (2024/1781) and the Battery Regulation (2023/1542) without fluff: which MES functions already produce the data, what is missing, how to wire it up architecturally with GS1 Digital Link, and what to do in the nine months left before the deadline.
OmniMES logoOmniMES

Innovative production execution system - Your eye on the production process

  • Home
  • Blog
  • About
  • function
  • Contact
  • FAQ
  • Offer
  • Privacy Policy
  • Tags
  • Terms
  • OmniMES News
x.com/OmnimesOfficialyoutube.com/@omni-mes
© 2021–2026 OmniMES™. All Rights Reserved.